Skip to Content
Home Campus Life News Elk Grove Center Ribbon Cutting on May 1

Elk Grove Center Ribbon Cutting on May 1

A daytime photo of the exterior of the new Building B at the CRC Elk Grove Center. Elk Grove Center, Building B

Join us for the dedication ceremony of the Elk Grove Center Phase II Building on Wednesday, May 1 at 1:30 pm. Building B is the first science facility at the student-centered, open-access outreach location of Cosumnes River College.

Building B will support students with biology, chemistry, and anatomy instructional laboratories, as well as much needed support and interaction spaces throughout the building.  The design includes large glass walls throughout the interior to connect the labs and interaction spaces, putting science on display.

The interaction spaces were designed with students’ needs in mind and encourages them to spend time on campus before and after classes. The faculty office suite includes an area where students and faculty can meet in small informal groups. The building also includes an east facing porch that can accommodate seating for informal outdoor academic activities.

At a Glance

  • 15,200 assignable square feet
    • 3,000 square feet of classroom space
    • 7,200 square feet of lab space
    • 2,600 square feet of student interaction space
  • LEED Certified Silver
  • Project Budget $16,914,000